A quiet journal of growing things
Circuit Monitoring Install: Half the Breakers Labeled Wrong
A former network engineer installs circuit-level monitors, labels half the breakers incorrectly, and learns why a careful mapping day beats a fast install every time.
Featured this week
Recent, worth reading
Energy Audit
My 2003 House: The Baseline Energy Audit (It Wasn't Pretty)
A former network engineer runs a full baseline energy audit on his 2003 Boise subdivision house and ...
The Control Panel
Why a Network Engineer Ripped Open His Electrical Panel
A former network engineer explains how one heat-pump install turned into ripping open the breaker pa...